Advanced Australian V2G Project (AAV2G)
![Australia Advanced V2G Project](https://evstation.com/wp-content/uploads/2022/02/Australia-Advanced-V2G-Project.jpeg)
In March 2021 the AAV2G (Advanced Australian V2G) project was kicked off with a small budget of AUD 1.2 million (USD 860,000) from the Australian Government. The challenge was to retrofit an existing series produced light-duty EV van to bidirectional power flow and implement onboard metering capabilities to turn the EV into a potential energy wallet.